PURPOSE
Make the review object unambiguous
This page focuses on an ordered package containing only approved presentation exports, viewing instructions, a manifest and a review prompt. Begin with the question the authorized reviewer must answer: presentation order, narrative clarity, drawing legibility, image selection, board completeness or readiness for another internal checkpoint. Do not replace a precise question with an oversized folder of project material.
The principal failure is a polished USB pack hiding missing files, unclear ordering or unnecessary editable sources. Define the public-facing preview name, internal edition, responsible entrant, intended recipient and closure condition. Keep the tracking identifier in the manifest and feedback form, not only in an email subject or USB label.
A controlled preview should remain understandable when separated from the authoring workstation. Include enough context to explain what is included, what remains outside scope, how it should be viewed and where an authorized reviewer should report a problem.
SOURCE BOUNDARY
Keep editable project sources outside
Retain BIM models, CAD files, linked references, rendering scenes, font files, licensed photographs and working notes in the entrant team’s controlled source environment. Export only the boards, images and documents needed for the stated review. A presentation preview is not a source-model archive or final submission package.
Inspect exported PDFs and images for hidden layers, comments, author names, file paths, geolocation, embedded attachments and metadata that do not belong in the review. Remove unnecessary personal and third-party material before applying any copy restriction.
RULE BOUNDARY
Check competition requirements separately
Technical presentation controls do not determine whether a competition permits encryption, executable viewers, USB delivery or protected PDFs. Read the current brief, submission rules and anonymity requirements. If the official platform requires ordinary files, do not substitute a protected preview for the mandated submission.
Keep the internal preview visibly distinct from the official entry. Record who approved the preview use and whether any reviewer is outside the entrant team or bound by separate confidentiality terms.
MANIFEST
Describe every included object
Record filename, board title, edition, file type, expected page count or dimensions and its purpose in the presentation. Note the intended display order and any authorized supplemental material. The manifest should let another entrant reconcile the pack without opening editable sources.
Store the manifest outside the protected media as well as inside the review pack. A missing media device should not erase the record of what was distributed.
DISPLAY
Test what the reviewer will actually see
Open the preview from a clean device that resembles the intended environment. Check board order, page fit, zoom, small labels, line weights, image contrast, color-critical elements, linked media, keyboard use and accessibility. Record the monitor, scaling, viewer and relevant operating environment.
Do not call an image “accurate” from one uncalibrated display. State what was tested and provide a safe alternative when the protected viewing route prevents legitimate review.
HANDOFF
Make custody and opening observable
Verify the intended recipient through an established channel. Record the media identifier, edition, handoff time, opening result, exception and recovery contact. If a password is required, send it separately and do not copy it into the manifest or receipt.
Limit personal data in the log. The purpose is to connect the reviewed boards to an accountable delivery event, not to create another archive of correspondence.
FEEDBACK
Attach comments to the right view
Ask reviewers to identify the board, edition, drawing or image region and requested decision. Distinguish observations about legibility from design preferences and rule-compliance concerns. Avoid vague labels such as “the red page” or screenshots without an edition reference.
Preserve the reviewed pack alongside the feedback record. If exports change, issue a new edition rather than silently replacing files beneath existing comments.
LIMITATION MAP
Describe controls without overstating them
Copy restriction: may constrain ordinary duplication in a supported viewing path, but cannot prevent photography, screen capture through another device or deliberate reconstruction.
Confidentiality: depends on recipient trust, agreements, access control and careful handling; software alone does not create a legal duty.
Authorship: is not established by a protected file, product log or distribution timestamp.
Competition compliance: must be checked against the current brief and official submission platform.
Recovery: requires editable sources, approved exports and the manifest to remain independently available.
State the exact product release, operating environment, media type and observed behavior. Retest after any change to the board edition, file type, viewer, Windows release, protection product or recipient workflow.